Holdpoint

The verification gate for critical infrastructure

Proof before
power-on.

Holdpoint checks the tests, inspections, and sign-offs for every asset on a construction project before power-on. Your team decides.

High-voltage switchroom with a lineup of low-voltage distribution boards and cable ladder overhead
High-risk switchroom · Pre-energization hold

Built for data centers · hospitals · substations · BESS · rail & industrial

Platform overview

See how assets move from evidence to cleared.

A one-minute walkthrough: contractor sign-in, evidence linked to assets, status by system, and the schedule.

Why Holdpoint

Power-on is the riskiest moment on a project. The proof for this equipment shouldn't be scattered.

Test results, inspection records, sign-offs. They sit in email threads and shared drives, and they decide when an asset gets power. Holdpoint shows what's proven, what's missing, and who changed it. Your team decides.

Scattered paperwork→ Proof linked to every asset
Verbal promises→ Evidence with a name and date
End-of-job paper chase→ Live readiness

The platform

A verification gate between your assets and power-on.

01

Capture evidence where it lives

Connect SharePoint and Autodesk Construction Cloud, bring in completed inspections from Fieldwire, or upload from site. Every document lands against the assets it proves.

02

Verify every asset

Check sheets, punch lists and test records against each asset, grouped by system and stage. Blockers show as soon as evidence is missing.

03

See it against the schedule

Sync Microsoft Project and see which critical path activities are waiting on evidence.

04

Hand over with an attributable record

Every link, sign-off and change is written to an append-only record, and your handover packs are built from it.

Field app in early access: check sheets, punchlist items and photos on the phone, including offline.

Integrations

Works with the tools your project already runs on.

SharePoint

Evidence stays in your SharePoint. Holdpoint links it to the assets it proves.

Autodesk Construction Cloud

Link evidence from ACC and sign in with your Autodesk account.

Microsoft Project

Schedule activities linked to the systems and assets they depend on.

Compliance gating

Know what is cleared. Know what is blocking.

Holdpoint brings tests, inspections and NCRs together against the assets they affect, so your team can see what is cleared and what is holding progress up.

  • Clear readiness status
  • NCRs linked to affected assets
  • Full evidence trail from test to handover
Readiness · Package ELEC-01Live
  • MV-SB-01Main MV switchboard
    Cleared
  • TX-02Transformer 2
    Cleared
  • DB-L3-ALevel 3 distribution board A
    Blocking
  • FDR-114Feeder 114
    Blocking
  • CHW-P-01Chilled water pump 1
    Cleared

Who it's for

Built for the human and autonomous workforce responsible for delivery.

Electrical Subcontractors

Keep working in Fieldwire, SharePoint or ACC. Completed inspections and test records link to the assets they prove.

General Contractors

See every verification blocker on your critical path. Track asset clearance and room readiness across every trade: electrical, mechanical, fire and ICT.

Asset Owners

Portfolio-wide view of what's cleared and what isn't on each project.

Robots & AI Agents

Autonomous workers are joining project teams. The people operating them see the same cleared status and evidence as everyone else.

Industries

Wherever critical infrastructure is energized.

01

Data centers

Prove every rack, board, chiller and feeder is ready before the commissioning agent and energy marshal walk the floor.

02

Hospitals & healthcare

Essential power systems demand a verifiable trail from installation to energization, for every asset, not just the samples.

03

Substations & utilities

High-voltage plant, strict authority requirements, zero tolerance for missing test records at the point of connection.

04

BESS & renewables

Fast-moving packages with layered OEM, EPC and authority criteria, with evidence metadata linked to every asset.

05

Rail & industrial

Thousands of cables and terminations across multiple trades, gated and cleared package by package.

06

Commercial & mixed-use

Keep base-build and tenant energization evidence separated, verified and ready for the certifier.

Get started

See your project's energization readiness on one screen.

A 25-minute walkthrough with Holdpoint's CEO and Founder, on your project structure: packages, assets, criteria and evidence.