Holdpoint

Solar · Wind · Battery storage

Every test record, linked to the asset it proves.

Holdpoint is the verification gate for solar, wind and battery projects. It links each test record to the asset it proves and shows which assets are cleared and which are blocked, with the reason.

Readiness · Package BESS-01Sample data
  • CBL-MV-114MV feeder cable 114Evidence verified
    Cleared
  • INV-07Inverter 7Evidence verified
    Cleared
  • TX-01Transformer 1Sign-off out of order
    Blocked
  • BESS-ENC-12Battery enclosure 122 ITRs outstanding
    Blocked
  • CLG-P-02Cooling pump 2Evidence verified
    Cleared
  • FP-03Fire panel 3Open NCR
    Blocked

The problem

Every energization depends on thousands of test records being complete.

A solar, wind or battery project holds thousands to tens of thousands of test records across electrical, protection, control, mechanical and fire systems. All of them must be complete before each energization. The gaps tend to surface late, in the final checks before energization.

Holdpoint does not manage AEMO hold points. It is the evidence underneath them: every test record and sign-off, linked to the asset it covers.

AEMO Commissioning Guideline · January 2026

Plant is capped at each hold point until testing and reporting are signed off by the network service provider and AEMO.

Read the guideline(opens in a new tab)

CEFC and ARENA · January 2020

ARENA's first large-scale solar funding round, measured against the completion date forecast at financial close.

Average38 weeks
delay to practical completion, averaged across the round's projects
About10 weeks
of that delay arose in hold point testing
Read the report(opens in a new tab)

What Holdpoint does

One rule for every asset. A reason for every block.

  1. 01

    Evidence present

    The required test records are linked to the asset.

  2. 02

    No open blocker

    No open NCR or Category A punch item is raised against it.

  3. 03

    Sign-offs in order

    Its check sheets are signed in the required sequence.

All three met: the asset shows as cleared. Any one missing: it shows as blocked, with the reason. Holdpoint reports the result. A qualified person decides what happens next.

Linked to the asset it proves

Each test record and inspection report is filed against the inverter, transformer, battery enclosure, pump, cable or fire panel it covers. One record can cover many assets, and each asset still shows its own evidence.

Signed on the device

Field records are signed on the device that captures them and written to an append-only record. Each result keeps its author, its time and its history. The field app is in early access and works offline.

Evidence stays in your document system

Evidence files stay where your project already keeps them. Holdpoint links to them and does not take them over.

Works with, live today

SharePoint, Autodesk Construction Cloud and Fieldwire.

Rolling out

Procore, Aconex and Bluebeam.

Solar, wind and battery storage

Every trade on the project, not only electrical.

Electrical, protection, control, mechanical and fire systems are checked against the same rule. Examples of assets on each project type:

Solar farms

  • Inverters
  • Transformers and switchgear
  • DC and AC cabling
  • Protection relays
  • Plant control and SCADA

Wind farms

  • Turbine transformers
  • Collector cabling and switchgear
  • Protection relays
  • Control and SCADA systems
  • Substation plant

Battery storage

  • Battery enclosures
  • Power conversion systems
  • Transformers and switchgear
  • Cooling systems and pumps
  • Fire detection and suppression panels

Who it's for

Built for the teams who deliver and own the plant.

EPC and balance-of-plant electrical contractors

Link test records to the assets they prove as the work is completed, and see which assets are cleared and which are blocked before the final checks.

Owners and developers

See which assets have verified evidence and which are blocked, package by package, across the whole project.

BESS integrators

Battery enclosures, power conversion, cooling and fire systems, each asset with its own evidence.

Renewables and battery projects increasingly feed data center load. Holdpoint verifies the evidence the same way on the data center side.See the industries