Shutdowns · Turnarounds · Outages
Every work order backed by a signed work pack.
Holdpoint is the verification layer for planned maintenance on plant in service. It shows which work orders and assets are cleared and which are blocked, with the reason, so the responsible person can decide on return to service.
Where it sits
Between the CMMS, the permit system and the schedule.
The CMMS holds the work orders. The permit system holds the permits. The scheduler holds the plan. None of them shows whether the signed evidence for each work order is complete.
Holdpoint does not replace any of them. It does not permit, authorize or decide work. It shows what is cleared and what is blocked, and why.
What Holdpoint does
From work order to signed pack to cleared.
- 01
Work orders in
Import the shutdown work orders from the CMMS export, SAP PM or Maximo, as a CSV or Excel file. The work order number links the order, the schedule line, the permit and the signed pack.
- 02
Work packs signed
Each work order holds its tasks in order, with planned hours. Crews record each task on the phone, offline. The signing roles sign in order, and every attempt is kept.
- 03
Cleared or blocked
Each work order, asset and system shows as cleared when its evidence is verified. Anything else shows as blocked, with the reason.
Progress earned from recorded tasks
Progress is counted in hours from recorded tasks, against the plan from your MS Project or P6 schedule. A typed percentage is shown as an estimate, never as evidence. The shift handover report is made from stored snapshots.
Permits recorded as given
Holdpoint records the permit number and its status as the crew or permit office gives it. It does not issue, change or close a permit, and it does not record an isolation.
Evidence stays in your document system
The close-out pack for each work order is saved to your own document system. Holdpoint does not take the files over.
After the work
A record for every work order and every asset.
Shutdown support is in development. These are the outputs it is built to produce.
Return to service
Each asset and system shows cleared or blocked, with the reason: an open task, an unsigned role, a failed result without a retest, or an open Category A punch item or NCR. Holdpoint states that the evidence is complete. A named person records the return to service decision.
Close-out pack
One PDF per work order: the task record and signatures, permit entries as recorded, readings and test sheets, photos, found work and linked documents.
Asset history
Every work order, task and test on an asset across shutdowns, back to its commissioning record.
Reporting
Shutdown progress and earned hours are available to Power BI through the reporting API.
Integrations and data sources
Works with the tools your project already runs on.
Integrations and data sources
In development

Integrations and data sources
In development
Get started
See what is cleared and what is blocked on a sample project.
Open the sample project to see assets, evidence and blockers, or click Book a walkthrough and our team will arrange a call to discuss your shutdown, turnaround or outage structure.